First tidal

新闻中心 2024-09-22 15:25:08 71915

Nova Innovation has announced the installation of the first electric vehicle charge point powered by tidal energy, which is located on the island of Yell in the Shetlands.

The evolt charge point has been installed at Cullivoe harbor by the shores of Bluemull Sound, a strait between the northern Shetland islands of Unst and Yell. It's being operated by ChargePlace Scotland, the national EV charging network owned and operated by the Scottish Government.

"Tidal turbines in the Shetland Tidal Array supply the energy that is converted into electricity for the charge point," the company told New Atlas. "Each 100-kW turbine could provide enough electricity to charge two 50-kWh battery Teslas in an hour."

Nova Innovation's tidal turbines have been providing Shetland homes and businesses with electricity for more than five years. The first 30-kW turbine installed in Bluemull Sound became operational in April 2014. This was decommissioned two years later and replaced by a 100-kW tidal turbine, which was connected to the local grid in August 2016.

本文地址:http://o.zzzogryeb.bond/html/40a799354.html
版权声明

本文仅代表作者观点,不代表本站立场。
本文系作者授权发表,未经许可,不得转载。

全站热门

13 Astronomical Clocks Connecting Time And Space

South Korea gears up for forestry cooperation with North Korea

Korea aims to draw 400,000 foreign medical patients

Cleveland one win away: Your viewing guide to Game 5 of the World Series

10 Big Misconceptions About Computer Hardware

Apple's new macOS beta release adds hundreds of new emoji

我市将建24个党员现代远程教育信息化建设示范村

Jennifer Lawrence is a germaphobe and thinks 'dick is dangerous'

友情链接